We use cookies 🍪
We use cookies and other similar technologies to improve your browsing experience and the functionality of our site. Learn more in our Privacy Policy.

Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW

Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
Tama WBS30RS-LOR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Ocean Blue Ripple/Chrome HW
from
1,503.25€
Ex Tax: 1,503.25€
  • Stock: In warehouse - 4-7 days
  • Brand: Tama
  • Model: WBS30RS-LOR
  • SKU: WBS30RS-LOR
  • EAN: 4549763207357
Skladom 0
In warehouse - 4-7 days 1 ks
Pre-Ordered 0
Sold: 0
Views: 446

The evolution of Starclassic from maple, birch, bubinga, birch/bubinga continues, and now - after intense analysis, rigorous research, development, and product testing - we have arrived at the latest Starclassic modern development, Starclassic Walnut/Birch.

We discovered the perfect ratio of walnut to birch that produced a superior quality of low-to-mid frequency warmth that perfectly complemented the clear attack and higher frequency projection of birch. The sound is familiar, but distinctively different from Tama sounds of the past.

The Starclassic series continues to represent our collective drum-making passion, wisdom, and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines our commitment to evolve our drum sounds and inspire the contemporary drummer.

Specifications

Configuration20" x 14" BD, 12" x 8" RT, 14" x 14" FT
ShellsRT/FT 6mm 4ply Birch + 2 inner ply American Black Walnut; BD 8mm 5ply Birch + 2 inner ply American Black Walnut
HeadsEvans®
HoopsDie-Cast
Feature 1Swivel-Wing Tom Holder (US.PAT.NO.9087498)
Feature 2Air Cushioned Floor Tom Legs
Feature 3Bass Drum Spur Bracket (Starclassic)
Feature 4Claw Hooks
Feature 5Quick-Lock Tom Brackets (US.PAT.NO.9269337) (Starclassic)
Feature 6Star-Cast Mounting System
Feature 7Hold Tight™ Washers (US.PAT.NO.7307204)

Write a review