Tama WBS32RZS-MPB Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Molten Platinum Burst/Chrome HW
from
1,503.25€
Ex Tax: 1,503.25€
2,804.88€
Ex Tax:2,804.88€
3,657.72€
Ex Tax:3,657.72€
Tags:
Burst/Chrome
, HW
, Kit
, Lacquer
, Molten
, Platinum
, Shell
, Starclassic
, TAMA
, Walnut/Birch
, pcs
Exploring limitless possibilities, Tama's result in the wake of countless experimentation came in the form of the hybrid shell: Walnut/Birch. This shell combination brings the superior quality warmth and mid-to-low frequency tone of the increasingly popular and truly unique Walnut, with the well-defined and uncompromisingly solid attack of Birch. This 3-piece shell pack configuration consists of a versatile 22"x14" (non-drilled), 12"x8" tom and 16"x16" floor tom. Tama's MC69 single tom attachment is included. Tama successfully applied their trademark engineering with high-tech and efficient drum craftmanship to create a distinctive sounding and highly flexible drum set.
Specifications
| Configuration | 22"x14"BD, 12"x8"TT, 16"x16"FT & MC69 Single Tom Attachment |
| Shells | Walnut/Birch Hybrid Shells, TT/FT/SD: 6mm, 4ply Birch + 2 inner ply Black Walnut / BD:8mm, 5ply Birch + 2 inner ply Black Walnut |
| Heads | Evans® Drum Heads |
| Hoops | Die-Cast |
| Feature 1 | Inside Lacquer |
| Feature 2 | Star-Cast Mounting System |
| Feature 3 | Starclassic Lugs |
| Color | MOLTEN PLATINUM BURST |
| Made in | CHINA |

