Out Of Stock
Tama WBS30RS-MDR Starclassic Walnut/Birch Lacquer Shell Kit 3 pcs - Molten Raspberry Fade/Chrome HW
2,804.88€
Ex Tax:2,804.88€
3,657.72€
Ex Tax:3,657.72€
The evolution of Starclassic from maple, birch, bubinga, birch/bubinga continues, and now - after intense analysis, rigorous research, development, and product testing - we have arrived at the latest Starclassic modern development, Starclassic Walnut/Birch.
We discovered the perfect ratio of walnut to birch that produced a superior quality of low-to-mid frequency warmth that perfectly complemented the clear attack and higher frequency projection of birch. The sound is familiar, but distinctively different from Tama sounds of the past.
The Starclassic series continues to represent our collective drum-making passion, wisdom, and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines our commitment to evolve our drum sounds and inspire the contemporary drummer.
We discovered the perfect ratio of walnut to birch that produced a superior quality of low-to-mid frequency warmth that perfectly complemented the clear attack and higher frequency projection of birch. The sound is familiar, but distinctively different from Tama sounds of the past.
The Starclassic series continues to represent our collective drum-making passion, wisdom, and pursuit to offer refined and differentiated sounds. Starclassic Walnut/Birch defines our commitment to evolve our drum sounds and inspire the contemporary drummer.
Specifications:
| Configuration | 20" x 14" BD, 12" x 8" RT, 14" x 14" FT |
| Shells | RT/FT 6mm 4ply Birch + 2 inner ply American Black Walnut; BD 8mm 5ply Birch + 2 inner ply American Black Walnut |
| Heads | Evans® |
| Hoops | Die-Cast |
| Feature 1 | Swivel-Wing Tom Holder (US.PAT.NO.9087498) |
| Feature 2 | Air Cushioned Floor Tom Legs |
| Feature 3 | Bass Drum Spur Bracket (Starclassic) |
| Feature 4 | Claw Hooks |
| Feature 5 | Quick-Lock Tom Brackets (US.PAT.NO.9269337) (Starclassic) |
| Feature 6 | Star-Cast Mounting System |
| Feature 7 | Hold Tight™ Washers (US.PAT.NO.7307204) |

